It is the first question we hear on almost every estimate. How long will this take? You need to plan around furniture, tenants, or simply living in the space while we work, so here is a straight answer, plus what actually moves the timeline one way or the other.
A single room, walls only, often takes 1 to 2 days. A two bedroom condo, walls and ceilings, usually runs 2 to 4 days. A full house interior, walls, ceilings, trim and doors, usually takes 5 to 10 days depending on scope. A strata corridor or common area floor often takes 1 to 3 days per floor.
Treat these as planning figures, not promises. The real schedule gets set at the walkthrough. They assume proper prep and two coats, not a rushed one coat job. If someone promises you a full house in two days, ask what they are skipping. It is usually the prep.
Prep is easily half the job. Filling nail holes, patching drywall, caulking gaps, sanding, masking everything that should not get painted. A room with battered walls takes noticeably longer than one in good shape, but skipping prep is how you get paint that peels in a year.
Most repaints need two full coats for even coverage and true colour. A dramatic colour change, dark to light or a bold accent wall, can need a primer plus two coats. Each coat adds application time plus drying time.
Drying time stretches in damp fall and winter weather. Quality latex paint is dry to the touch in a few hours, but recoat windows and cure times get longer when the air is wet. Rushing the second coat is a classic cause of flashing and uneven sheen, so we schedule around it.
Extras add real days. Wallpaper stripping, popcorn ceiling removal, spraying cabinets, refinishing all the doors and trim. They are also what separate a basic repaint from a full transformation.
Occupancy matters too. A furnished, occupied home takes longer than an empty one. More masking, more moving, more sequencing to keep daily life working. On strata work, elevator bookings and resident notices set the pace.
Finalize colours before start day. Last minute colour changes mean extra trips to the paint store and sometimes a restart.
Sort out the furniture before start day as well. Decide with us what gets moved, by whom, and where it goes while we paint, heavy pieces especially.
One point of contact helps more than people expect. Decisions stall when five people weigh in. Nominate one person who can approve touch ups on the spot.
A detailed, itemized proposal before work starts is the best predictor of an on time finish. That is exactly what our guide to choosing a painter in Vancouver recommends looking for, and it is how we work on every job. Walkthrough and scope first, then a clear detailed quote with the schedule in it, then a crew on site working prep, paint and finishing in sequence, and a final walkthrough with you before sign off.
Usually, yes. We use modern low odour latex paints and work room by room, so most clients carry on with daily life around the project. Furniture can usually go back the next day for light placement. Give walls about two weeks before washing or scrubbing them. Paint feels dry long before it is fully cured.
Modern quality paint has very little odour, and it clears within hours with normal ventilation. Most of our clients stay in the home for the whole project.
Every space is different. The fastest way to know your timeline is a walkthrough. Call Exceptional Painting at (236) 995-6777. We paint with Sherwin Williams SuperPaint, which carries a manufacturer lifetime warranty on the paint. Our workmanship carries a 3 year warranty, and we are WCB covered with $5M in liability insurance. Wondering about cost? See our painting costs guide.